![HEIDELBERG Speedmaster CD 102 Manual Download Page 16](http://html1.mh-extra.com/html/heidelberg/speedmaster-cd-102/speedmaster-cd-102_manual_2118608016.webp)
GR SG9015883000000000
Safety
confidential
A.1.10
4.2
Pile control control panel
5
6
7
2
3
4
1
Fig. 9
Pile control control panel
1
Auxiliary pile up
The auxiliary pile moves upwards as long as
the button is pressed.
2
Auxiliary pile down
The auxiliary pile moves down as long as the
button is pressed.
3
Main pile up
The main pile moves upwards as long as the
button is pressed.
4
Main pile down
Moves the main pile down. The downward
movement stops approximately 12 cm above
the ground. Pressing the button again briefly
moves the pile support plate down to a distance
of approximately 1 cm above the floor. Pile sup-
port plate and pile support frame are centered
and set down to the floor.
5
Pile stop
Interrupts the movement of auxiliary pile and
main pile.
6
Pile to D.S.
”Manual” mode: Moves the active pile to D.S.
7
Pile to O.S.
”Manual” mode: Moves the active pile to O.S.
Summary of Contents for Speedmaster CD 102
Page 6: ...Main chapter overview A 2...
Page 20: ...Main chapter overview B 2...
Page 114: ...Preset Plus Feeder confidential C 1 76...
Page 118: ...Main chapter overview D 4...
Page 120: ...Chapter overview D 1 2...
Page 134: ...General information confidential D 1 16...
Page 136: ...Chapter overview D 2 2...
Page 146: ...Chapter overview D 3 2...
Page 166: ...Maintenance confidential D 3 22...