GSK980TC3 Series Bus Turning CNC system PLC, Installation and Connection User Manual
80
Ⅱ
Operation
2. Select the Edit [Alt+E]--- Cutting [T] of the main menu;
3. Shortcut key [Ctrl+X].
The cut content is placed to the clipboard, which is copied to the ladder diagram by the paste
operation.
3.3.3.2 Copy
There are three ways for carrying out this operation after the ladder diagram area to be copied is
selected:
1. Select the copy after springing out the environment menu by clicking the right key of the mouse;
2. Select the Edit [Alt+E]--- Copy [C] of the main menu;
3. Shortcut key [Ctrl+C].
The selected content after copying is put to the clipboard, which is copied to the ladder diagram by
the paste operation.
3.3.3.3 Pasting
There are three ways for carrying out this operation after the ladder diagram area to be pasted is
selected:
1. Select the pasting after springing out the environment menu by clicking the right key of the
mouse;
2. Select the Edit [Alt+E]--- Pasting [P] of the main menu;
3. Shortcut key [Ctrl+V].
3.3.3.4 Deletion
There are three ways for carrying out this operation after the ladder diagram area to be deleted is
selected:
1. Select the basis code ---- Deletion node after springing out the environment menu by clicking the
right key of the mouse once;
2. Click the [Deletion node] button on the editing bar;
3. Shortcut key [Delete];
3.3.3.5 Insertion Line
There are three ways for carrying out this operation after moving the cursor to the position to be
inserted the ladder diagram line:
1. Select the insert after springing out the environment menu by clicking the right key of the mouse;
2. Select the Edit [Alt+E]---Insertion line [I] of the main menu;
3. Shortcut key [Insert];
3.3.3.6 Deletion Line
There are three ways for carrying out this operation after moving the cursor to the position to be
deleted the ladder diagram line:
1. Select the insert after springing out the environment menu by clicking the right key of the mouse;
Summary of Contents for 980TC3 Series
Page 13: ...1 Programming Ⅰ Programming Ⅰ ...
Page 71: ...59 Operation Ⅱ Ⅱ Operation ...
Page 97: ...85 III Ⅲ Function III Function ...
Page 149: ...137 Installation and Connection Ⅳ Ⅳ Installation and Connection ...
Page 209: ...197 附 录 Appendix ...