GSK980TC3 Series Bus Turning CNC system PLC, Installation and Connection User Manual
190
Inst
allation
and
Connection
Ⅳ
4. Time sequence
Chuck control input signal
:
DIQP
Output signal
:
DOQPJ
(
Outside chuck clamping/inside
chuck releasing
)
Input signal
:
WQPJ
(
Outside chuck in-position/inside chuck
releasing in-position
)
Output signal
:
DOQPS
(
Outside chuck clamping/inside
chuck releasing
)
Input signal
:
NQPJ
(
Outside chuck in-position/inside chuck
releasing in-position
)
Fig.4-14-1
4.15 Tool Change Control
The standard ladder diagram supports two kind of tool post control logic; setting K parameter’s
corresponding control bit can select the adaptive tool post. Select it by Bit0 and Bit1.
K0002
BIT1
BIT0
K2.0=0
,
K2.1=0
:
standard electric tool post(adaptive Changzhou tool post)
K2.0=1
,
K2.1=0
:
servo tool post (adaptive to Taida tool post servo, see Appendix 1)
K2.0=0
,
K2.1=1
:
hydraulic tool post
D0000
Total cutter spacing quantity of tool post
General electric tool post
:
K2.0=0
,
K2.1=0
,(
adaptive Changzhou tool post
)
1
)
Control parameters
K0012
BIT3
K0013
BIT0
K12.3 1
:
check the cutter spacing signal after tool change ends
0
:
do not check the cutter spacing signal after tool change ends
K13.0 1
:
the electric tool post’s general cutter spacing signal is normally open
0
:
the electric tool post’s general cutter spacing signal is normally closed
T036
Total time of tool change
(
0-65535ms
)
T037
Tool post reversal locking time
(
0-65535ms
)
TMRB09
Delay time from the tool post’s rotation CW stop to reverse output
(
0-65536ms
)
2) Signal address
:
X0003 T8 T7 T6 T5 T4 T3 T2 T1
Summary of Contents for 980TC3 Series
Page 13: ...1 Programming Ⅰ Programming Ⅰ ...
Page 71: ...59 Operation Ⅱ Ⅱ Operation ...
Page 97: ...85 III Ⅲ Function III Function ...
Page 149: ...137 Installation and Connection Ⅳ Ⅳ Installation and Connection ...
Page 209: ...197 附 录 Appendix ...