Recipe Setup
9–18
Flow Meter Calibration Procedure
Selection 1, 2, 3, or 4: Calibrating the
Meters Individually
NOTE:
Take a large sample (1000 cc or more) of a
fluid that is a known accurate weight per gallon so that
any error in measuring the sample is spread out.
WARNING
PRESSURIZED EQUIPMENT HAZARD
To avoid splashing fluid in the eyes when
calibrating the meters:
Wear eye protection.
Only open the ratio check valves enough to
allow fluid to flow at a rate of 100 to 200 cc per
minute.
CAUTION
The fluid shut-off valves and ratio check valves are
retained in their housings by mechanical stops that
prevent accidental removal of the valve stem while
the manifold is pressurized. Do not use a tool to
open or close the valve stems. If manual force
cannot turn the valve stems, the system pressure
must be relieved and the valve properly disas-
sembled and cleaned to remove the resistance.
1.
Make sure the operator switch is set at
Standby
.
CAUTION
Both the Component A, B, and C fluid shut-off valves
must be closed if you choose to do a calibration test.
Selecting enter on the calibration menus will auto-
matically open the dispense valve for the meter
being tested.
2.
Enter selection 1, 2, 3, or 4 for the flow meter you
want to calibrate.
SETUP
Recipe: 1
Station: 1
METER CALIBRATION TESTS
1. COMPONENT A FLOW METER CALIBRATION
2. COMPONENT B FLOW METER CALIBRATION
3. COMPONENT C FLOW METER CALIBRATION
4. SOLVENT FLOW METER CALIBRATION
5. MIXED MATERIAL CALIBRATION
Select a menu item and press enter:
> 1
3.
Close the Component A, B, and C fluid shut-off
valves and ratio check valves.
4.
Place a waste container under the ratio check
valve tube for the meter being tested.
5.
Press Enter
to begin calibration.
SETUP
Recipe: 1
Station: 1
COMPONENT A FLOW METER CALIBRATION
Enter Component A Meter K-Factor:
> 0.124 cc/pulse
Press Enter to begin calibration:
> STOP
Calibration Volume is 0 cc
Enter new Calibration Volume:
> 0 cc
-OPERATOR SWITCH MUST BE IN STANDBY-
6.
Open the Component A ratio check valve and
dispense about 50 cc to clear the tube of any air.
Close the ratio check valve.
7.
Press the Previous
key to stop the calibra-
tion. Enter selection 1 to calibrate component A
again.
Continued on the next page.
Summary of Contents for PrecisionMix ii
Page 6: ...6 ...
Page 7: ...1 1 Warnings Warnings 1 ...
Page 8: ...1 2 Warnings ...
Page 11: ...Overview 2 1 Overview 2 ...
Page 12: ...2 2 Overview ...
Page 15: ...Overview 2 5 ...
Page 31: ...Installation 3 1 Installation 3 ...
Page 32: ...Installation 3 2 ...
Page 58: ...Installation 3 28 Notes ...
Page 67: ...Operation 4 1 Operation 4 ...
Page 68: ...Operation 4 2 ...
Page 83: ...Operation 4 17 Notes ...
Page 90: ...Operation 4 24 ...
Page 91: ...Screen Map 5 1 Screen Map 5 ...
Page 92: ...5 2 Screen Map ...
Page 94: ...5 4 Screen Map ...
Page 95: ...Run Monitor 6 1 Run Monitor 6 ...
Page 96: ...Run Monitor 6 2 ...
Page 103: ...Totalizers 7 1 Totalizers 7 ...
Page 104: ...Totalizers 7 2 ...
Page 108: ...Totalizers 7 6 ...
Page 109: ...System Configuration 8 1 System Configuration 8 ...
Page 110: ...System Configuration 8 2 ...
Page 142: ...System Configuration 8 34 ...
Page 143: ...Recipe Setup 9 1 Recipe Setup 9 ...
Page 144: ...Recipe Setup 9 2 ...
Page 165: ...10 1 Troubleshooting Troubleshooting 10 ...
Page 166: ...10 2 Troubleshooting ...
Page 182: ...10 18 Troubleshooting ...
Page 183: ...11 1 Service Service 11 ...
Page 184: ...11 2 Service ...
Page 192: ...11 10 Service ...
Page 193: ...12 1 Parts Parts 12 ...
Page 194: ...12 2 Parts ...
Page 207: ...12 15 Parts Notes ...
Page 228: ...12 36 Parts ...
Page 229: ...13 1 Utilities Software Utilities Software 13 ...
Page 230: ...13 2 Utilities Software ...
Page 254: ...13 26 Utilities Software ...
Page 255: ...14 1 Technical Data Technical Data 14 ...
Page 256: ...14 2 Technical Data ...
Page 259: ...14 5 Technical Data Notes ...