GE
V
OLUSON
i / V
OLUSON
e
D
IRECTION
KTI106052, R
EVISION
10
S
ERVICE
M
ANUAL
3-10
Section 3-4 - Preparing for Set Up
3-4-1
Verify Customer Order and Inspect Components
(cont’d)
•
Optional:
Visually inspect the Modo Cart components using the following checklist.
NOTE:
Report any items that are missing, back-ordered, or damaged, to your GE sales representative. The
contact address is shown in
Contact Information on page 1-18
.
•
Optional:
Visually inspect the Dock Cart components using the following checklist.
NOTE:
Report any items that are missing, back-ordered, or damaged, to your GE sales representative. The
contact address is shown in
Contact Information on page 1-18
.
Table 3-6
Damage Inspection Checklist - Modo Cart (optional)
Step
Item
Recommended Procedure
1
Main label
Enter
Serial Number:
__________________________ (printed on main label)
2
Probe Holders
Clean the gel wells with warm water and a damp cloth to remove all traces of gel.
3
Covers
Check that all screws are in place, all chassis and internal covers are installed.
4
Transformer
Check the isolation transformer connectors and the associated cabling for good connection and proper
insulation.
Japan only:
Exchange pull out protection of main power cord.
5
Power Cord
Check the power cord for cuts, loose hardware, tire marks, exposed insulation, or any deterioration.
Verify continuity.
6
Front Castors
Check that the front castors can swivel, and can be placed in the locked position by pressing the foot
brake lever n each castor.
7
Rear Castors
Check that the rear castors can roll and swivel.
8
Modo Cart
Voltage
Verify that the voltage of the optional Modo Cart is correct.
see:
Section 3-4-3 "Modo Cart Voltage Configuration" on page 3-20
Table 3-7
Damage Inspection Checklist - Dock Cart (optional)
Step
Item
Recommended Procedure
1
Main label
Enter
Serial Number:
__________________________ (printed on main label)
2
Probe Holders
Clean the gel wells with warm water and a damp cloth to remove all traces of gel.
3
Covers
Check that all screws are in place, all chassis and internal covers are installed.
4
Transformer
Check the power supply connectors and the associated cabling for good connection and proper
insulation.
Japan only:
Exchange pull out protection of main power cord.
5
Power Cord
Check the power cord for cuts, loose hardware, tire marks, exposed insulation, or any deterioration.
Verify continuity.
6
Front Castors
Check that the front castors can swivel, and can be placed in the locked position by pressing the foot
brake lever n each castor.
7
Rear Castors
Check that the rear castors can roll and swivel.
8
Dock Cart
Voltage
Verify that the voltage of the optional Dock Cart is correct.
see:
Section 3-4-4 "Dock Cart / Dock Cart light / Voluson Station Voltage Configuration" on page 3-21
b
b
Summary of Contents for Voluson i BT06
Page 2: ......
Page 11: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL ix ZH CN KO...
Page 44: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL xlii Table of Contents...
Page 514: ...GE VOLUSON i VOLUSON e DIRECTION KTI106052 REVISION 10 SERVICE MANUAL IV Index...
Page 515: ......