![GE Ultrasonic USM Go Operator'S Manual Download Page 94](http://html.mh-extra.com/html/ge/ultrasonic-usm-go/ultrasonic-usm-go_operators-manual_128490094.webp)
Chapter 3. Making Measurements
76
USM Go Operator’s Manual
3.3
Displaying Measured Results (cont.)
•
DA - Material-thickness depth from the probe-contacted side of the test-piece surface to the reflector, represented by the Gate A echo.
•
DB - Material-thickness depth from the probe-contacted side of the test-piece surface to the reflector, represented by the Gate B echo.
•
LA - Leg number of the reflector, represented by the Gate A echo.
•
LB - Leg number of the reflector, represented by the Gate B echo.
•
PA - Projection distance from the probe BIP to the reflector, represented by the Gate A echo.
•
PB - Projection distance from the probe BIP to the reflector, represented by the Gate B echo.
•
RA - Projection distance from the probe BIP to the reflector, represented by the Gate A echo, minus the current X-VALUE.
•
RB - Projection distance from the probe BIP to the reflector, represented by the Gate B echo, minus the current X-VALUE.
•
A%rA - Amplitude of the signal crossing Gate A, as a percentage of the active
EVAL MODE
reference amplitude.
•
A%rB - Amplitude of the signal crossing Gate B, as a percentage of the active
EVAL MODE
reference amplitude.
•
dBrA - dB equivalent height difference
between the signal crossing Gate A and the active
EVAL MODE
reference height.
•
dBrB - dB equivalent height difference
between the signal crossing Gate B and the active
EVAL MODE
reference height.
Summary of Contents for Ultrasonic USM Go
Page 2: ......
Page 4: ... no content intended for this page proceed to next page ...
Page 18: ...Preface xvi USM Go Operator s Manual no content intended for this page proceed to next page ...
Page 162: ...144 USM Go Operator s Manual no content intended for this page proceed to next page ...
Page 178: ...Appendix C EN 12668 Specifications 160 USM Go Operator s Manual ...
Page 189: ......