![GE Ultrasonic USM Go Operator'S Manual Download Page 55](http://html.mh-extra.com/html/ge/ultrasonic-usm-go/ultrasonic-usm-go_operators-manual_128490055.webp)
Chapter 2. Instrument Setup
USM Go Operator’s Manual
37
2.4 Installing a Probe
Follow the instructions in this section to install a probe on your USM Go.
2.4.1 Connecting the Probe
When connecting a probe to the instrument, the following steps must be taken:
•
Properly complete the physical connection of the probe to the instrument.
•
Properly configure the instrument to work with the connected probe.
The USM Go accepts either a
single-element
probe or a
dual-element
probe.
To install a
single-element
probe, connect the probe cable to either of the two ports on
the side of the instrument (see
Figure 11
to the right). When a
dual-element
probe is
connected to the instrument, the key between and below the ports ensures proper
orientation of the transmit and receive connectors.
Figure 11: Probe Connector Locations
Receive
Probe
Transmit
Probe
Summary of Contents for Ultrasonic USM Go
Page 2: ......
Page 4: ... no content intended for this page proceed to next page ...
Page 18: ...Preface xvi USM Go Operator s Manual no content intended for this page proceed to next page ...
Page 162: ...144 USM Go Operator s Manual no content intended for this page proceed to next page ...
Page 178: ...Appendix C EN 12668 Specifications 160 USM Go Operator s Manual ...
Page 189: ......