Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8 - 99
8-2-46
Fuse Set
8-2-46-1
Tools
•
Common philips screwdrivers
•
Allen/Unbraco wrench
•
Stubby screwdriver (Flat tip and Cross tip)
8-2-46-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-46-3
Removal procedure
1.) Remove the AC Transbox assy. Refer to the
8-2-42 "ARP II Assy 110V/220V" on page 8-90
2.) Replace the 2 fuses located on the ACPC II assy in the transbox assy. Refer to the Figure 8-146.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-46-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-146 FUSE in Transbox(AP950) assy
Table 8-47 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-46. Equipment
passed all required tests and is ready for use. “
Summary of Contents for LOGIQ P6
Page 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Page 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Page 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Page 477: ......