GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 8-7 - Mechanical Option Installation instruction
8 - 193
8-7-11-1 VCR Remote Port Configuration
4.) Set the DIP switch on the VCR remote control panel. The SW 7 in DIP switch should be set to “ON”
position for the USB remote control . Refer to the Figure 8-314.
5.) Insert the remote control module into the VCR and connect the USB cable between the “Remote”
USB on the console rear panel and USB port of VCR.
6.) Plug the service dongle and turn on the VCR and System.
7.) Login to maintanance mode and open the device manager.
8.) Check if the VCR remote device is identified by OS. Refer to the Figure 8-315.
Figure 8-314 DIP Switch on the Panel
Figure 8-315 Remote device in the device manager
Summary of Contents for LOGIQ P6
Page 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Page 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Page 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Page 477: ......