GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
8 - 98
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
7.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-45-4
Mounting Procedure
Install the new parts in the reverse order of removal.
When install Transbox assy, the transbox chassie should be inserted into the guide rails which are under
the frame chassi.
Table 8-46 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-45. Equipment
passed all required tests and is ready for use. “
Transbox/ Fan Function Validation Procedure
Outlet Test - Wiring Arrangement - USA &
Isolated Patient Lead (Source) Leakage–Lead
Isolated Patient Lead (Source) Leakage–Lead
Figure 8-145 Insert the Transbox assy
Summary of Contents for LOGIQ P6
Page 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Page 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Page 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Page 477: ......