GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 4-9 - Board Function Checks
4 - 47
4-9-13
AP950 Transbox Assy Function Validation Procedure
1.) Turn on the system. Refer to the
3-5-1 "Power On/Boot Up" on page 3-11
to check AP950 Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the
Section 4-5 "Peripheral Checks" on page 4-21
confirm the peripheral operation. All peripheral must work correctly as described Section 4-5.
4-9-14
Fuse set Function Validation Procedure
1.) Turn on the system. Refer to the
3-5-1 "Power On/Boot Up" on page 3-11
sequence to check AP950
Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to the
Section 4-5 "Peripheral Checks" on page 4-21
peripheral must work correctly as described Section 4-5.
4-9-15
ARPII Assy Function Validation Procedure
1.) ARPII Assy function can be validated by the result of 'Peripheral Test'. Once ARii Assy is replaced,
do peripheral test in order to confirm the successful installation. Refer to the
.
Summary of Contents for LOGIQ P6
Page 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Page 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Page 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Page 477: ......