![GE LOGIQ 400 Service Manual Download Page 429](http://html.mh-extra.com/html/ge/logiq-400/logiq-400_service-manual_128623429.webp)
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
7–11
PERIODIC MAINTENANCE
REV 5
7–3–3 Chassis Leakage Current Test (Continued)
Data Sheet for Chassis Source Leakage Current
Follow the foregoing test procedure. The test passes when all readings measure less than the value shown in the
table below (TABLE 7–2).
TABLE 7–2
MAXIMUM ALLOWANCE LIMIT FOR CHASSIS SOURCE LEAKAGE CURRENT
COUNTRY
NORMAL
OPEN
REVERSE
OPEN
CONDITION
GROUND
POLARITY
NEUTRAL
USA
N/A
0.3mA
0.3mA
N/A
OTHERS
0.1mA
0.5mA
0.5mA
0.5mA
CAUTION
Electric Shock Hazard. When the meter’s ground switch is OPEN, don’t touch the unit!
CAUTION
Equipment damage possibility. Never switch the Polarity and the status of Neutral when the
unit is powered ON. Be sure to turn the unit power OFF before switching them using the PO-
LARITY switch and/or the NEUTRAL switch. Otherwise, the unit may be damaged.
TABLE 7–3
DATA SHEET FOR CHASSIS SOURCE LEAKAGE CURRENT
Enter name of tested peripheral here:
ON
NORM
OPEN
ON
NORM
CLOSED
ON
REV
OPEN
ON
REV
CLOSED
OFF
NORM
OPEN
OFF
NORM
CLOSED
OFF
REV
OPEN
OFF
REV
CLOSED
Unit
Tester
Tester
Test1
Test2
Test3
Test4
Test5
Power
POLARITY NEUTRAL or
Probe
wheel
CRT
Switch
GROUND
connector
Switch