![GE LOGIQ 400 Service Manual Download Page 416](http://html.mh-extra.com/html/ge/logiq-400/logiq-400_service-manual_128623416.webp)
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
RENEWAL PARTS
6–286
REV 9
6–7–4 Procedures (continued)
(C) System Check–out
1.
Plug in the unit.
2.
Turn the circuit breaker located at the rear side of the Power Supply to the ON position (upper side).
3.
Turn the LOGIQ
400 system power ON.
4.
Make sure that the power supplies are within each tolerance. Refer to the section 4–4 “POWER SUPPLY AD-
JUSTMENTS” in chapter 4. For the tolerances of the power supplies, refer to TABLE 4–3. For the measurement
locations, refer to TABLE 4–4 and ILLUSTRATION 4–32 on page 4–43.
5.
Adjust the power supplies to the appropriate voltage as necessary if the they are out of tolerance.
6.
Perform functional checks to verify that the system is functioning properly. Refer to Chapter 4, FUNCTIONAL
CHECKS in the LOGIQ
400 Service Manual, 2127661.
7.
Turn the LOGIQ
400 system power OFF.
8.
Screw four screws ( 1 – 4 ) to install the Left PS Cover. Refer to ILLUSTRATION 6–171.
IRE–INSTALLING LEFT PS COVER
ILLUSTRATION 6–171