Installation
Filling with SF
6
gas
GE Information
07- 2016
L32- 007EN/07
4/8
Confirm the pressure
Process
The table below gives the confirmation operation steps of the filling pressure
with SF
6
gas :
Step
Action
Comment/Diagram
1
Disconnect the tube (10) - of the
pressure reducer - from the filling
tool (2).
NOTE
: Keep
the
unconnected end of the tube
(10) higher than the other end,
to stop the SF
6
gas which it
contains from escaping and to
prevent moisture entering.
2
10
2
S
Connect the tube (15) - of the
gauge 0- 1 MPa (14) - to the
filling tool (2).
S
When the required pressure is
confirmed, remove the gauge
(14) and and store it away from
humidity.
14
15
2
3
Remove the filling tool (2) and
refit the plug (17) (4 daN.m)
2
17
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......