Installation
Chamber - Column Coupling
GE Information
L31- 7142EN/02
11/18
03- 2017
Final coupling,
continued
Removing the
chamber transport
cover
The table below shows the steps for removing the chamber transport cover:
Step
Action
Illustration
5
Using
wire
cutters,
cut
through the ’Rilsan’ collar (9)
holding the connector tube
and remove it.
9
6
Using the coupling tool (35),
remove the tube (10) and sep-
arate the cover (4) from the
stop ring (8).
10
35
4
8
7
Fit the trolley stop (34) and fix
in place using the bolts (40)
recovered from the transport
cover, hand tightening them.
x 2
H M16- 55
34
40
8
Prepare the fitting tool (35)
by screwing the coupling pin
(24) onto its end, hand tight-
ening.
35
24
Continued on next page.
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......