Installation
Installation of operating device
GE Information
L31- 7902EN/02
5/12
11- 2016
Preparing the pole operating shaft
, continued
“Manual opening”
operation,
continued
The table below gives the steps of “manual opening” operation :
Step
Action
Diagram
3
Put back the blocking tool
(4) on the flange of the
sleeve (12).
NOTE
: This tool ensure
the angular positioning of
pole operating shaft dur-
ing the coupling with the
operating mechanism.
6
4
12
4
M10
4
Remove the lever (6).
5
Remove the safety plate (5)
and the screws from the
flange on the front of the
handle sleeve (12).
12
5
8
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......