Installation
Vacuum operation
GE Information
08- 2016
L31- 881EN04
5/6
Vacuum operation with nitrogen purging (N
2
)
, continued
Vacuum operation
,
continued
The table below gives the continuation of the steps of the vacuum operation
with nitrogen purging (N
2
) :
Step
Action
Comment/Diagram
6
Disconnect the tube (12) from the
filling tool (4).
12
4
7
Remove the filling tool (4) with
the valve cap.
4
8
Connect the vacuum pump and
open the tap (1) to bring the
volume of pole back to ambient
pressure (filled with nitrogen at
0.03 MPa).
Open
Closed
1
9
Carry out
a new simple
vacuum operation.
1 mbar (100 Pa)
during 1 hour.
END OF PROCEDURE
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......