Installation
Vacuum operation
GE Information
08- 2016
L31- 881EN04
4/6
Vacuum operation with nitrogen purging (N
2
)
, continued
Vacuum operation
The table below gives the steps of the vacuum operation with nitrogen purging
(N
2
) :
Step
Action
Comment/Diagram
1
Carry out a simple vacuum
operation.
1 mbar (100 Pa)
during 1 hour.
2
Remove the valve cap (5) of the
filling tool (4).
5
4
3
S
Open the nitrogen (N
2
) bottle
tap (9).
S
Open and close the cock (11)
of the pressure reducer to
eliminate any air inside the tube
(12) (approx. 3 s at low
flow- rate).
S
Close the nitrogen (N
2
) bottle
tap (9).
9
12
N
2
Closed
11
Open
4
Connect the tube (12) to the filling
tool (4).
4
12
5
Open the nitrogen (N
2
) bottle tap
(9) and adjust gas output by act-
ing on the cock (11) of the pres-
sure reducer (reduced flow rate).
S
Close the tap (9) from time to
time to check pressure on the
gauge (13).
S
Start filling again until the
required
pressure
about
0.03 MPa
is reached.
S
Close in this order : the tap (9),
then the cock (11).
9
13
Open
N
2
Closed
11
Continued on next page.
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......