Installation
Filling with SF
6
gas
GE Information
07- 2016
L32- 007EN/07
6/8
Checking pressure
, continued
Decision table
The table below gives the process depending the pressure measured :
14
16
If the pressure measured is ...
Action
correct
End of control
too high
Adjust the pressure by means of valve
(16) on the gauge (14) to reach the
required corrected pressure.
too low
Top- up with SF
6
gas
If the pressure
adjustment
is ...
Action
0.05 MPa
End of control
0.05 MPa
Proceed to a
new inspection
after
a
stabilization
period
of
2- 3 hours.
End of control
The table below gives the end steps of the checking pressure :
Step
Action
Diagram
1
Disconnect the gauge (14)
0- 1 MPa.
14
2
S
Remove the filling tool (2)
and re- install the plug (17),
applying a tightening torque of
4 daN.m; leak- tightness is only
guaranteed if this condition is
respected.
S
Screw the valve- cap (3) on
the filling tool (2).
3
2
17
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......