Installation
Installation of operating device
GE Information
L31- 7902EN/02
9/12
11- 2016
Fastening the operating device
, continued
Wedging
and tightening
The table below gives the wedging procedure for the fastening screws
depending to the X play :
X
22
20
Important
35 daN.m
24
25
If the X play is ...
Action
X
1 mm
Tighten to the indicated tightening
torque.
X
1 mm
D
Wedge between the spacer (22)
and the operating device (20) with the
provided wedges (24)- (25).
D
Tighten the screw to the
indicated tightening torque.
Lifting strap
Remove the lifting strap.
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......