Installation
Chamber - Column Coupling
GE Information
L31- 7143EN/02
2/16
03- 2017
Checking of the insertion resistor
Process
The table below gives the steps of checking of the insertion resistor :
Step
Action
Diagram
1
Using
the
two
straps
provided, lift the chambers
(approximate
weight :
700 kg).
On each resistor, remove
the plug (36) fixed by
screws (37).
36
x 6
H M8- 25
37
2
Measure the ohmic value
using a multimeter.
If the measured value
does not correspond to
the value indicated on the
plug, contact our Cus-
tomer Service.
Ω
3
Re- install the plugs (36)
using the screws (37), refer-
ring to “Screw sealing” in
”Erection general proced-
ures”.
Put back the chambers.
36
x 6
H M8- 25
1,6 daN.m
37
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......