Installation
Lifting and positionning the pole
GE Information
L31- 766EN/07
2/4
03- 2017
Positioning the lifting straps
Process
The table below gives the steps of positioning the lifting straps :
Step
Action
1
D
For poles of circuit- breakers fitted with a column made up with
three insulators, four 6 m lifting straps are sufficient.
D
For columns made up with four insulators, prepare four wholes :
one 3 m lifting strap (1) knotted with one 6 m lifting strap (2).
2
Pass the lifting straps like the picture below.
- The lifting straps “
a
” pass
over
the housing (7).
- The lifting straps “
b
” pass
under
the housing (7).
3
Cross the lifting straps “
a
” and “
b
” and place them onto the frame
using the four lifting shackles (8).
2
1
7
a
b
3
8
8
a
b
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......