Installation
Installation of operating device
GE Information
L31- 7902EN/02
2/12
11- 2016
Preparing the operating device
Unpacking
Remove packaging protection and check that operating device and pole
reference numbers are the right ones.
Optical signalizations
Check the position of operating device optical signalization :
Circuit- breaker
Open
Closing spring
Released
Necessary
components
List of the Grid Solutions components necessary for the operation :
Mark
Diagram
Designation
Number
(11)
Seal
1
(22)
Spacer
4
Installing the
necessary
components
- Install the spacers (22) on the screws (9) outside the operating device.
- Install the seal (11) on the operating shaft (13).
- Check the presence of grease (ASEOL 0- 365.2) on the operating shaft
(13).
13
x 4
9
22
11
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......