Installation
Filling with SF
6
gas
GE Information
07- 2016
L32- 007EN/07
3/8
Filling with SF
6
gas
Filling pressure
calculation
Calculate the SF
6
gas filling pressure in accordance with the temperature and
the local atmospheric pressure.
Filling is carried out to calculated pressure plus 0.01 MPa.
See the module “
SF
6
gas monitoring
” (Calculation of the filling pressure at
site).
Ambient
temperature
0
C
Process
The table below gives the steps of the filling with SF
6
gas operation :
7
11
Open
Closed
9
SF
6
Step
Action
Comment
1
Open the SF
6
gas bottle tap (7)
and adjust gas output by acting on
the cock (9) of the pressure
reducer (
reduced flow rate
).
Close the tap (7) from time to
time to check pressure on the
gauge (11).
2
Start filling again until the
required pressure is reached.
3
Close in this order : the tap (7),
then the cock (9).
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......