Grid Solutions
PS 0003EN
04
1996-03-18
2011-03-21
2 / 3
Sheet N°
Revision
1st issue
Revision date
Page
SAFETY INSTRUCTIONS
P
ACKIN
G
TRAN
SPO
RT
IN
STALL
ATI
ON
STAR
T-
UP
OP
ER
ATI
ON
MA
IN
TEN
AN
CE
SC
RAP
P
IN
G &
RE
CY
CL
IN
G
1
Pressurized Equipment : General.
1.1 Comply with the assembly instructions shown on
both our equipment and the gas bottles.
X
X
X
X
X
X
X
1.2 Before starting work on any pressurized piece of
equipment, make sure there is no pressure.
X
X
X
X
1.3 Before any handling, check to see how the
equipment is fixed to its frame and how the frame is
itself anchored.
X
X
X
X
1.4 High-pressure pipes must be fixed or otherwise
made safe.
X
X
X
X
1.5 Before initial pressurization, check that all circuits
are properly sealed.
X
X
X
X
1.6 Never tighten a pressure fitting.
X
X
X
X
1.7 Ensure that for every bolted connection for a volume
under pressure there is an appropriate and properly
fastened bolt at each relevant point.
X
X
1.8 It is strictly forbidden to lift or otherwise move a
piece of equipment inflated to a pressure in excess
of 300 hPa of gas.
X
X
X
X
X
1.9 Before giving any orders to move equipment, check
visually or by ear that all the relevant pipe fittings
are tight.
X
X
X
1.10 Comply with the standard instructions governing the
use of compressed gas bottles (e.g. keep the bottle
away from any source of heat).
X
X
X
X
X
X
X
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......