Installation
Chamber - Column Coupling
GE Information
L31- 7142EN/02
10/18
03- 2017
Final coupling,
continued
Removing the
chamber transport
cover
The table below shows the steps for removing the chamber transport cover:
Step
Action
Illustration
1
Remove the fixings (40) and
insert the lever (32) through
the bracket rings (7).
Pull on the lever (32) to open
the cover (4).
Hold on two two of the cover
bolts (40) for later use.
32
x 8
H M16- 55
40
7
4
2
Start timing
.
(The final chamber/column
coupling operations should
be completed within
40 min
)
.
3
Pull off the cover (4) to free
the stop ring (8) and ’rilsan’
collar (9).
8
4
9
4
Fit the protective cover (33).
33
Continued on next page.
Summary of Contents for GL317D
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 295: ...GE Information This page is intentionally blank...
Page 296: ......