
UPPER LEVEL ASSEMBLY: Disassembly Procedure
Revision A
DASH 2000 Patient Monitor
7-5
2000 412-001
5.
Undo the 3 screws which hold the PCB Mainconnector and remove it.
6.
Disconnect DAS flat cable from PCB Mainboard.
7.
Remove ground wire from PCB Mainboard.
8.
Undo the 2 hexagonal spacers and the 3 screws which hold the PCB
Mainboard.
9.
Pull the PCB Mainboard from the Power Supply Connector.
Power Supply PCB
1.
Disassemble the
PCB Mainboard
as described above.
2.
Disconnect the AC-Line Connector from the Power Supply PCB
3.
Undo the 4 screws which hold the Power Supply PCB and remove it.
NOTE
When reassembling the Power Supply PCB on the frame
be sure the ferrite ring is on the upper left distance bolt
and the shield carton is under the Power Supply PCB.
Assembly Note
NOTE
When reassembling the PCBs or the DASH 2000 use the
above described disassembly instructions in reverse
order.
Summary of Contents for marquette Dash 2000
Page 12: ...Contents viii DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Page 82: ...Maintenance Repair Log 3 36 DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Page 156: ...UPPER LEVEL ASSEMBLY Spare Parts List 7 10 DASH 2000 Patient Monitor Revision A 2000 412 001 ...
Page 157: ...Revision A DASH 2000 Patient Monitor 8 1 2000 412 001 8 ASSEMBLY DRAWINGS Contents ...
Page 159: ......
Page 173: ......
Page 178: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 184: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 200: ......
Page 201: ......