![GAYLORD CG3-UVi-SPC Series Technical Manual Download Page 51](http://html.mh-extra.com/html/gaylord/cg3-uvi-spc-series/cg3-uvi-spc-series_technical-manual_570445051.webp)
_________________________________________________________Chapter 4 - Maintenance, Page 4-7
Operator Preventive Maintenance – Cont.
Removing Cells – Cont.
13.
After Cell has been removed, replace
with a clean Cell taken from the soak tank.
Caution -
Be sure to
replace the Cells with the airflow arrow pointing up as marked on the Cell Nameplate (Refer to
Figure 4-7-2.
14.
Reconnect the 3 wires to the terminals on the Cell.
15.
Repeat this process for each Cell.
16.
Close the ESP Cell Access Door and latch.
17.
Place the dirty Cells in the soak tanks. Fill with hot
water and add Gaylord Formula G-510EF at a ratio of
one part detergent to ten parts water. Leave the Cell
in the tank until the next rotation.
18.
Record the ESP Cell rotation on your Cell Rotation
Frequency Log Chart (Refer to Appendix “C”).
Figure 4-7-2
ESP Cell Nameplate
Cell Model #
Cell must be
orientated with this
arrow facing up
Figure 4-7-1
Receiving Studs