_________________________________Appendix D – Ventilator Start-Up Inspection and Tests, Page D-3
Page 1 of 6
Ventilator Start-Up Inspection and Test Report
For Gaylord Model CG3-UVi-SPC Series Ventilators
________________________________________________________________________________________________________________________
Facility Name
Gaylord Representative Company Name
_______________________________________________ __________________________________
Address
Gaylord Representative Name
_______________________________________________ _____________________________________
City State
Zip
Signature
_______________________________________________ _____________________________________
Facility Contact Phone #
Date of Start-Up Gaylord File Number
_______________________________________________ _____________________________________
Facility E-Mail
_____________________________________________________________________________________
Overview
Model CG3-UVi-SPC Series contain UV Lamps and therefore the Start-Up Inspection and Test Report
must be performed by a Gaylord Certified Service Agency (CSA). The ESP Cells and the UV Lamp Modules
are shipped in separate boxes from the Ventilator. The installing contractor is responsible for installing
the ESP Cells and the CSA installs the UV Modules when performing the Ventilator Start-Up Inspection
and Test Report. Instructions to the CSA; complete this form for all Ventilator sections controlled by a
single Command Center.
Installation of UV Lamp Modules
1.
Open the UV Module Access Doors, remove the Blocking Plates and slide in the UV Lamp Modules.
Install the 8 holding nuts and tighten to 7-9 in-lbs. ………………………………………………… ____ Yes ____ No
2.
Connect the Lamp / Ballast Connector Plug. ………………………………………………………….. ____ Yes ____ No
3.
Close the UV Module Access Doors and latch.
4.
Open the Extraction Chamber Access Doors, all Particulate Separators are in place ____ Yes ____ No
ESP Cell Check
1.
Open the ESP Cell Access Door. Are all Cells installed. …………………………………………… ____ Yes ____ No
2.
Are the Cell wires connected. ……………………………………………………………………………. ____ Yes ____ No
Exhaust Volume Readings
1.
Check to make sure all Extraction Camber, UVi and ESP Cell Access Doors are closed and latched.
2.
Push the
START FAN
button on the Gaylord Command Center. The exhaust fan should come on.
Note; if the Ventilator is a standard CG3-UVi-SPC Series (includes electric damper) it will take up to 45
seconds for the damper to open to the exhaust and the exhaust come up to 100%. Did the exhaust
fan come on. ………………………………………………………………………………………………………… _____ Yes ____ No
3.
Determine the exhaust volume for each Ventilator section by following the instructions on Page 6-1
Record all readings in the Exhaust Volume Chart on Page 2 of 4. Record the Design CFM from the
Gaylord Drawings or the Ventilator Nameplate. If the installation includes a Plenum Box make-up air
system, take velocity readings and record on the chart.