6. SYSTEM DESIGN
OUTDOOR UNIT INSTALLATION PRECAUTIONS
12-2.
PLACES WHERE USE PROHIBITED
Places where there is the danger of combustible gas leakage
●
Places where sulfur gas, chlorine gas, acid, alkali, or other matter which effects equipment is
●
generated
Places not affected by heat radiation from other heat sources
●
Places where the air is not stagnant
●
Places where machinery which generates high frequencies is used
●
Ocean beaches and other areas where there is a lot of salt
●
Installation in vehicles, ships, and other conveyances
●
Factory, etc. where voltage fluctuations are large
●
POINTS TO REMEMBER WHEN INSTALLING
1) The set shall be installed at a place which can withstand the weight and vibration of the
outdoor unit
2) To allow maintenance after refrigerant piping, drain piping, and electric wiring connection and
installation, provide an installation service space.
*Installation service space is shown on "3.OUTDOOR UNIT & BRANCH BOX"
3) Be careful when installing the set at the following places.
[Installation precautions]
Contents
Countermeasures (Reference)
When installed
near adjacent
houses
Perform installation work so that operating
sound does not disturb the neighbors.
1) Install a soundproof barrier
2) Change the installation site
When there is
the possibility
of strong wind
1) If the outdoor unit is exposed to strong
wind, capacity may drop, frost may form
during heating, and operation may be
stopped by high pressure rise. In addition,
when a very strong wind blows, the fan
may be damaged.
2) When a very strong wind blows, there is
the possibility of the outdoor unit being
toppled over if held only by foundation
bolts
1) Install with the outlet side
1000mm (39in.) or more
away from a facing wall or
fence.
2) Make the outlet direction
and wind direction
perpendicular.
3) Fasten the outdoor unit
using toppling prevention
hardware (procured at the
site).
When snow
accumulates
If the outdoor unit is covered by accumulated
snow, it may not be able to operate.
1) Make the foundation as
high as possible.
2) Perform snow prevention
work.
- (06 - 132) -
SY
S
T
E
M
DE
SIGN
SY
S
T
E
M
DE
SIGN
Summary of Contents for ARU12RLF
Page 3: ...1 GENERAL INFORMATION DTR_BMU001E_03 CHAPTER01 2010 08 25 Hybrid Flex Inverter System ...
Page 18: ...2 MODEL SELECTION DTR_BMU001E_04 CHAPTER02 2010 10 04 Hybrid Flex Inverter System ...
Page 38: ...3 OUTDOOR UNIT BRANCH BOX Hybrid Flex Inverter System DTR_BMU001E_04 CHAPTER03 2010 10 04 ...
Page 58: ...4 INDOOR UNITS Hybrid Flex Inverter System DTR_BMU001E_05 CHAPTER04 2010 11 12 ...
Page 116: ...5 CONTROL SYSTEM DTR_BMU001E_04 CHAPTER05 2010 10 04 Hybrid Flex Inverter System ...
Page 152: ...6 SYSTEM DESIGN DTR_BMU001E_04 CHAPTER06 2010 10 04 Hybrid Flex Inverter System ...
Page 287: ...7 OPTIONAL PARTS Hybrid Flex Inverter System DTR_BMU001E_03 CHAPTER07 2010 08 25 ...