6. SYSTEM DESIGN
ADDITIONAL CHARGE CALCULATION
2-5.
The outdoor unit is charged refrigerant at the factory.
●
Additional refrigerant required to be charged on site depending on pipe length.
●
The additional refrigerant charge amount is calculated according to the following formula.
●
Round up the calculated result to two decimal places.
●
CALCULATION OF ADDITIONAL CHARGE REFRIGERANT
Diameter of liquid
pipe
unit: in. (mm)
Additional amount for
pipe length
unit: oz./ft. (g/m)
ø1/4 (6.35)
0.224 (21)
ø3/8 (9.52)
0.624 (58)
Calculation of additional amount for pipe length
Total
length of
ø3/8in.
(9.52mm)
liquid pipe
x 0.624
oz./ft.
(58g/m)
ft (m)
oz. (g)
Total
length of
ø1/4in.
(6.35mm)
liquid pipe
x 0.224
oz./ft.
(21g/m)
ft (m)
oz. (g)
+
=
=
Total
oz. (g)
Total
lbs (kg)
- (06 - 17) -
SY
S
T
E
M
DE
SIGN
SY
S
T
E
M
DE
SIGN
Summary of Contents for ARU12RLF
Page 3: ...1 GENERAL INFORMATION DTR_BMU001E_03 CHAPTER01 2010 08 25 Hybrid Flex Inverter System ...
Page 18: ...2 MODEL SELECTION DTR_BMU001E_04 CHAPTER02 2010 10 04 Hybrid Flex Inverter System ...
Page 38: ...3 OUTDOOR UNIT BRANCH BOX Hybrid Flex Inverter System DTR_BMU001E_04 CHAPTER03 2010 10 04 ...
Page 58: ...4 INDOOR UNITS Hybrid Flex Inverter System DTR_BMU001E_05 CHAPTER04 2010 11 12 ...
Page 116: ...5 CONTROL SYSTEM DTR_BMU001E_04 CHAPTER05 2010 10 04 Hybrid Flex Inverter System ...
Page 152: ...6 SYSTEM DESIGN DTR_BMU001E_04 CHAPTER06 2010 10 04 Hybrid Flex Inverter System ...
Page 287: ...7 OPTIONAL PARTS Hybrid Flex Inverter System DTR_BMU001E_03 CHAPTER07 2010 08 25 ...