Log&Report
Reports
FortiGate Version 4.0 Administration Guide
01-400-89802-20090424
675
•
For information about how to configure a report layout, see the
.
The following procedure describes how to clone a report schedule. When you clone a
report schedule, a duplicate of the original is used as a basis for a new one.
To view the list of report schedules, go to
Log&Report > Report Config
.
To configure a report schedule, go to
Log&Report > Report Config
, select
Create New
,
enter the appropriate information and then select
OK
.
Figure 440: Report schedules in Report Config
General report schedule settings
Create New
Create a new report schedule.
Name
The name of the report schedule.
Description
The comment made when the report schedule was created.
Report Layout
The name of the report layout used for the report schedule.
Schedule
When the report schedule will be generated. The time depends on
what time period was selected when the report schedule was created:
once, daily, or specified days of the week.
For example, if you select monthly, the days of the month and time
(hh:mm) will appear in the format Monthly 2, 10, 21, 12:00.
Delete and Edit icons
Delete or edit a report schedule in the list.
Clone icons
Create a duplicate of the report schedule and use it as a basis for a
new report schedule.
Report schedule configuration settings
Delete
Edit
Clone
Summary of Contents for Gate 60D
Page 705: ...www fortinet com...
Page 706: ...www fortinet com...