56
3. Attach the switch assembly just left of the
Taylor internal switch, to the inside of the
cover plate. The ELE 510 switch lever
should be just above the internal draw pin
as shown.
4. With the freezer turned off and with no
product in the freezer, pull the handle into
the open position to see if the draw pin
depresses the switch lever. If not, reposition
the switch so that it makes full contact.
NOTE:
THE SWITCH MUST BE POSITIONED
SO THAT THE SWITCH LEVER IS FULLY
DEPRESSED WHEN THE DRAW HANDLE IS
IN THE OPEN POSITION.
5. Slide the switch cable jack through the
center slot at the back of the panel.
6. Replace the front panel.
7. Connect one end of the switch extension to
the ELE 510 switch port. Connect the other
end of the extension to the switch port
labelled “PORT 1” on the underside of the
Touch Panel. Ensure the connections are
fully engaged.
NOTE:
WHILE “PORT 2” IS ALSO A VALID
SWITCH PORT, IT IS TEMPORARILY
PLUGGED TO AVOID CONFUSION. YOU
WILL ACTIVATE THE PORT YOU USE WHEN
YOU GO THROUGH THE EQUIPMENT
SETUP WIZARD PROGRAM ON YOUR
COLOR TOUCH PANEL LATER.
NOTE:
CABLE CLIPS MAY BE USED TO
SECURE THESE CABLES SO THAT THEY
DO NOT INTERFERE WITH THE OPERATING
PARTS ON THE FRONT OF THE FREEZER.
26096
26097
26098
Summary of Contents for CTP 80CBB
Page 7: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...8 General System Overview Figure 1 ...
Page 14: ...13 PAGE INTENTIONALLY LEFT BLANK ...
Page 15: ...14 Premium Blending Assembly and Related Parts Figure 3 ...
Page 17: ...16 Syrup Pump and Related Parts Figure 4 ...
Page 19: ...18 Sanitizer Pump and Related Parts Figure 5 ...
Page 22: ...21 PAGE INTENTIONALLY LEFT BLANK ...
Page 23: ...22 Electronic Parts and Connections Figure 6 ...
Page 25: ...24 Spare Parts Kit Figure 7 ...
Page 26: ...25 PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...49 PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...69 PAGE INTENTIONALLY LEFT BLANK ...