42
CIP - Phase 4: Reassemble
22. Reconnect the syrup lines and bags of
syrup by pressing the syrup bag connector
onto the bag fitment valve.
23. Install the duckbill check valve into the
syrup line manifold and the syrup line
manifold into the coupler body.
24. Carefully align the pins of the syrup line
manifold with the syrup line connector and
insert the end of the 9-Tube Assembly fully
into the coupler.
25. Push the coupler nut into the coupler body
and rotate the coupler body until motion
stops to secure.
26. Install the cap on the manifold.
27. Perform the “Assembling the Blending
Assembly” and “Installing the Blending
System” sections of the DAILY OPENING
PROCEDURES.
28. Empty and discard the remaining Stera-
Sheen sanitizer solution from the tank.
Rinse it out with water. Refill the sanitizer
tank with Flo-San sanitizer in the following
section “Refilling the Sanitizer Tank”.
29. Prime the syrup system as instructed in
“Priming the Syrup System.”
26176
26179
26189
Summary of Contents for CTP 80CBB
Page 7: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...8 General System Overview Figure 1 ...
Page 14: ...13 PAGE INTENTIONALLY LEFT BLANK ...
Page 15: ...14 Premium Blending Assembly and Related Parts Figure 3 ...
Page 17: ...16 Syrup Pump and Related Parts Figure 4 ...
Page 19: ...18 Sanitizer Pump and Related Parts Figure 5 ...
Page 22: ...21 PAGE INTENTIONALLY LEFT BLANK ...
Page 23: ...22 Electronic Parts and Connections Figure 6 ...
Page 25: ...24 Spare Parts Kit Figure 7 ...
Page 26: ...25 PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...49 PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...69 PAGE INTENTIONALLY LEFT BLANK ...