
Maintenance 11. Lithium Battery and Boards
LS20 Rev.4
139
In case of the low lithium battery power, the error to warn the voltage reduction occurs at
the Controller startup (the software startup). All position data will be lost and you will
need to calibrate all joints.
The life span of the lithium battery varies depending on the energizing hours and
installation environment of the Controller. It is about 1.5 years as a rough guide (when
the Controller is connected to power for 8 hours a day). When the Controller is not
connected to power, the battery consumption will significantly increase compared to when
the Controller is energized. If warnings of voltage reduction occur, replace the lithium
metal battery even if it has not reached the above product life.
For the EPSON RC+ 7.0 Ver. 7.2.x or later (firmware Ver.7.2.x.x or later), the
recommended replacement time for the battery can be checked in the [Maintenance] dialog
box of the EPSON RC+ 7.0.
For details, refer to the following manual.
Robot Controller RC90 Maintenance 6. Alarm
The battery may run out if it passes the recommended replacement time.
If no warnings of voltage reduction occur, the calibration for all joints is not necessary.
You need to perform calibration if the position moves from the originals after replaced the
battery.
Always use the lithium battery and battery board designated by us.
(Refer to
Maintenance: 14. Maintenance Parts List
.)
Be careful of the battery polarity to connect it correctly.
Name
Quantity
Note
Maintenance
parts
Battery unit
1
2167689
Lithium battery for replacement
(A set of 3 batteries)
Resolver board
1
1593214
Control board
1
2138032
Tools
Nippers
1
For cutting wire tie
Hexagonal wrench (width across flats: 3 mm)
1
For M4 screw
(For replacing battery board)
Material
Wire tie
2
For fixing battery unit (battery)
NOTE
Summary of Contents for LS20
Page 1: ...Rev 4 EM179R3533F SCARA ROBOT LS20 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL LS20 series Rev 4 ...
Page 8: ...vi LS20 Rev 4 ...
Page 12: ...TABLE OF CONTENTS x LS20 Rev 4 ...
Page 14: ......
Page 29: ...Setup Operation 2 Specifications LS20 Rev 4 17 LS20 804S Standard Model ...
Page 31: ...Setup Operation 2 Specifications LS20 Rev 4 19 LS20 804C Cleanroom Model ...
Page 33: ...Setup Operation 2 Specifications LS20 Rev 4 21 LS20 A04S Standard Model ...
Page 35: ...Setup Operation 2 Specifications LS20 Rev 4 23 LS20 A04C Cleanroom Model ...
Page 72: ......
Page 92: ...Maintenance 4 Cable 80 LS20 Rev 4 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Page 176: ...Maintenance 14 Maintenance Parts List 164 LS20 Rev 4 ...