
Maintenance 8. Arm #4
LS20 Rev.4
127
Joint #4
Reduction Gear
Unit
Installation
(1) Mount the plate to the new reduction gear unit.
Joint #4
Reduction Gear Unit
Plate
4-M5
×
18
(2) Install the U pulley.
Joint #4
Reduction Gear Unit
6-M4
×
15
Pulley
(3) Mount the Joint #4 motor to the reduction gear
unit.
Fix the motor shaft to the reduction gear unit.
Remove cover of the hole for fixing the motor
shaft, and loosen the screw to fix the motor shaft
to the reduction gear unit.
After fixing the shaft, mount the cover to the
hole.
2-M4
×
12
Joint #4 Motor
Joint #4
Reduction Gear Unit
Screw hole for fixing
the motor shaft
(4) Mount the Joint #4 motor unit to the Arm #2.
For details, refer to
Maintenance 8.2 Replacing the Timing Belt
.
Summary of Contents for LS20
Page 1: ...Rev 4 EM179R3533F SCARA ROBOT LS20 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL LS20 series Rev 4 ...
Page 8: ...vi LS20 Rev 4 ...
Page 12: ...TABLE OF CONTENTS x LS20 Rev 4 ...
Page 14: ......
Page 29: ...Setup Operation 2 Specifications LS20 Rev 4 17 LS20 804S Standard Model ...
Page 31: ...Setup Operation 2 Specifications LS20 Rev 4 19 LS20 804C Cleanroom Model ...
Page 33: ...Setup Operation 2 Specifications LS20 Rev 4 21 LS20 A04S Standard Model ...
Page 35: ...Setup Operation 2 Specifications LS20 Rev 4 23 LS20 A04C Cleanroom Model ...
Page 72: ......
Page 92: ...Maintenance 4 Cable 80 LS20 Rev 4 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Page 176: ...Maintenance 14 Maintenance Parts List 164 LS20 Rev 4 ...