
Maintenance 7. Arm #3
106
LS20 Rev.4
(4) Apply the proper tension to the Z belt, and
secure the Joint #3 motor unit.
Z belt tension:
: 93 N (9.5
±
0.75 kgf)
Axial tension (if being pulled): 186 N
To apply tension to the Joint #3 motor unit,
use the bolt at the front.
M4 Nut
Joint #3
Motor Unit
Plate M4 Bolt
(4)-1
Loosen the nut and turn the bolt.
Push in the Joint #3 motor unit.
(4)-2
After fixing the Joint #3 motor
unit, turn the bolt to leave from the
plate.
(4)-3
Check the tension using the ultrasonic tension meter.
For details, refer to
Maintenance 7.4 Checking the Timing Belt Tension
.
(4)-4
Repeat the steps (4)-1 through (4)-3 until you get appropriate tension.
(4)-5
After the adjustment, put the bolt back to its original position and fix it
with the nut.
(5) Connect the connectors: X231, X31
(6) Install the clip band removed in the removal step (5), bind the cables, and then fix
them.
Do not allow unnecessary strain on the cables.
(7) Install the Arm Top Cover.
For details, refer to
Maintenance: 3.1 Arm Top Cover.
(8) Check if the Joint #3 moves in a Jog motion by operating from EPSON RC+ menu -
[Tools]-[Robot Manager]-[Jog & Teach].
If the Manipulator oscillates with MotorON and the following errors are detected,
Error 5041: Motor torque output failure in low power state.
Error 4241: Over speed during low power mode was detected.
or when the joint other than Joint #3 moves, the connector for other joint might be
connected to the Joint #3 motor. Check the connector connection.
(9) Execute the calibration of Joints #3, #4.
For details, refer to
Maintenance: 13. Calibration
.
NOTE
Summary of Contents for LS20
Page 1: ...Rev 4 EM179R3533F SCARA ROBOT LS20 series MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL LS20 series Rev 4 ...
Page 8: ...vi LS20 Rev 4 ...
Page 12: ...TABLE OF CONTENTS x LS20 Rev 4 ...
Page 14: ......
Page 29: ...Setup Operation 2 Specifications LS20 Rev 4 17 LS20 804S Standard Model ...
Page 31: ...Setup Operation 2 Specifications LS20 Rev 4 19 LS20 804C Cleanroom Model ...
Page 33: ...Setup Operation 2 Specifications LS20 Rev 4 21 LS20 A04S Standard Model ...
Page 35: ...Setup Operation 2 Specifications LS20 Rev 4 23 LS20 A04C Cleanroom Model ...
Page 72: ......
Page 92: ...Maintenance 4 Cable 80 LS20 Rev 4 4 2 Wiring Diagrams 4 2 1 Signal Cable ...
Page 176: ...Maintenance 14 Maintenance Parts List 164 LS20 Rev 4 ...