![Epson LQ-2550 Technical Manual Download Page 175](http://html.mh-extra.com/html/epson/lq-2550/lq-2550_technical-manual_109397175.webp)
REV.-A
4.2.4.5
Step 1:
Step 2:
Step 3:
Step 4:
Battery Removal
Remove the upper case. (Refer to Section 4.2.2.)
Disconnect connector
on the ROMA board.
Insert a slotted screwdriver into the groove of the lower case, then unlock the tab of the battery
case.
Remove the battery together with the battery case.
Battery Case
Screwdriver
/
G
I
Figure 4-18. Battery Removal
ADJUSTMENT REQUIRED
When connector
for the battery is disconnected, perform the following adjustment:
Section 4.3.5 Platen Gap Initial Value Write Operation (Page 4-46)
ASSEMBLY POINT:
●
When mounting the battery, push down the tab of the battery case with a slotted screwdriver so
that it can be smoothly inserted into the lower case.
4 - 1 3
Summary of Contents for LQ-2550
Page 1: ...L Q 2 5 5 0 TECHNICAL MANUAL EPSON ...
Page 240: ...REV A P r cl Figure 6 3 LQ 2550 Lubrication and Adhesive Application Points Diagram 2 6 3 ...
Page 241: ...REV A 7 i_ Figure 6 4 LQ 2550 Lubrication and Adhesive Application Points Diagram 3 6 4 ...
Page 252: ...REV A I 1 I 7 v m o m x b Figure A 6 PPD781OHG Block Diagram A 7 ...
Page 297: ...REV A 1 L I Irl N I i t 1 I I x Figure A 50 ROPSE Board Circuit Diagram A 52 ...