34
Installation and commissioning
CasaConnect KNX Control Center
• Version: 13.09.2021 • Technical changes and errors excepted.
fails, an emergency generator with corresponding switching from mains to emergency
operation should be installed on site.
Settings stored in the program are also retained after the power outage.
After a restart (e.g. restoration of power after a power outage or after a manual reset),
motors and devices, for which an automatic reset is set, are in automatic mode.
3.1.5. Installation of the control center (assembly
instructions)
3.1.6. Preparing the installation location
The device may only be installed and operated in dry indoor rooms.
Avoid condensation.
3.1.7. Preparing the control unit
The
CasaConnect KNX
can be installed in 2 standard sockets, however, a double
socket has more space for the cables.
The
CasaConnect KNX
is delivered assembled. The device, which comprises the dis-
play unit and support plant, therefore has to be dismantled. After installation and con-
nection, the device is reassembled in the reverse order.
Step 1
Display from below
The display unit is screwed to the sup-
port plate from below. Loosen the
screws.
Step 2
Display from the side
Pull the display unit forward from the
lower area by simultaneously pushing
from below against the two catches,
and hang it from the top edge.
The display can now be removed.
1
2