
2 Installation
2.3 Terminations
26
Control Relay easy800
11/11 MN04902001Z-EN
www.eaton.com
2.3 Terminations
Tools
easy800 standard: Slot-head screwdriver, width 3.5 x 0.6 mm, tightening
torque for screw terminals 0.6 Nm.
easy800-SWD: the push-in terminals eliminate the need for a tool.
Cable cross-sections
How to connect the easyNet network
2.4 Connecting the power supply
Cable protection
Connect cable protection (F1) of at least 1 A (slow) with the AC and DC
variant of the easy800 standard device and with the expansion unit.
Connect on easy800-SWD a cable protection (F1) rated for at least 3 A
(slow).
System test
The devices run a system test after the supply voltage has been switched
on. On easy800 standard, this system test lasts 1 s. After this time RUN or
STOP mode are activated - depending on the device and preset. On
easy800-SWD the system test lasts at least 5.6 s. easy800-SWD then
automatically switches to RUN mode.
The length of the system test varies:
Terminal capacities at mm
2
easy800 standard
easy800-SWD
Solid
0.2 to 4 (AWG 22 -12)
0.2 to 1.5 (AWG 24 -16)
flexible with ferrule
0.2 to 2.5
0.25 to 1.5
Device model
Time in s
easy800 standard
1
easy800-SWD
5.6 + n 0.12
n = Number of stations on the SWD line (1 - 99)