1.4.2.2 Installing the New Storage Device
Note
Before installing an RZ-series ISE, ensure that the bus node ID
jumpers are properly set and that the TERM ENABLE jumper is
removed. Some of the ISEs have two sets of jumpers for setting the bus
node ID. Refer to the reference booklet or data sheet that is shipped
with the ISE to set the proper bus node ID on one set of jumpers only.
Ensure that all of the jumpers are removed from the second set of
device address (Node ID) jumper pins.
Complete the following procedures to install a new storage device:
1.
Secure the bottom inside bracket and the top inside bracket to the storage
device using the screws provided in the upgrade kit (Figure 1–12).
2.
Reinstall the bottom outside bracket and then the top outside bracket.
3.
Connect the power and signal (50-pin) cables to both drives.
1–20 EF- and RZ-Series Integrated Storage Elements