Outline of Control (Indoor Unit)
ESIE09-08A
74
Function
2. Storage operation
When requesting space heating and domestic water heating (storage) at the same time, this involves
that the storage function is active and the start timer is reached (setting 1) during space heating
operation. The 3-way valve will switch over to domestic water heating operation. Now domestic
water will be produced till set point is reached or according to the running timer (setting [d-01]). The
3-way valve will switch back to space heating mode for the interval period (setting [d-02]). After this
interval the 3-way valve will go back to domestic water mode. This will continue till set point is
reached. At that moment, simultaneous request is finished and the system goes back to space heating
mode.
During the storage operation, the system does not take care off the room temperature. This means that
during simultaneous demand, the space only will be heated during the intervals of domestic water
production.
A
Operation
Space heating
Domestic water heating
B
Domestic hot water storage thermo-on request
C
Domestic hot water tank temperature
D
Room temperature thermo-on request
E
Remote controller room temperature
F
Domestic hot water lower limit temperature
G
Domestic hot water upper limit temperature (maximum possible storage temperature) [b-03]
K
External room thermostat set point
L
External room thermostat ON/OFF hysteresis
M
Simultaneous demand
N
ONLY space heating request
O
Start off interval period
P
Stop off interval period
Q
Space heating OFF
ON
ON
OFF
OFF
1
Maximum operation time for 1 cycle of domestic water heating (initial 30 minutes [d-01])
2
Interval minimum stop time for domestic water heating (initial 15 minutes [d-02])
3
Maximum operation time for domestic water heating (initial 30 minutes [d-01])
A
M
O P
Q
N
B
C
K
75°C
35°C
–X°C
+X°C
ON
G
F
OFF
D
E
ON
OFF
1
2
3
K
L
Summary of Contents for ALTHERMA HT EKBUHAA6 V3
Page 2: ......
Page 7: ...ESIE09 08A Table of Contents v 1 3 Service Tools 283 Index i Drawings Flow Charts iii ...
Page 16: ...Model Names of Indoor Outdoor Units Tanks ESIE09 08A 4 General Information ...
Page 28: ...Refrigerant Circuit ESIE09 08A 16 Refrigerant Circuit EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 40: ...Functional Parts Layout ESIE09 08A 28 Refrigerant Circuit ...
Page 63: ...ESIE09 08A PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 Refrigerant Circuit 51 ...
Page 64: ...PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 ESIE09 08A 52 Refrigerant Circuit ...
Page 125: ...ESIE09 08A Field Setting Test Operation 113 ...
Page 232: ...Troubleshooting by Indication on the Remote Controller ESIE09 08A 222 Troubleshooting ...
Page 237: ...ESIE09 08A Piping Diagrams Appendix 227 EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 250: ...Wiring Diagrams ESIE09 08A 240 Appendix EKHBRD 011 014 016 AB AC V1 ...
Page 251: ...ESIE09 08A Wiring Diagrams Appendix 241 ...
Page 256: ...Wiring Diagrams ESIE09 08A 246 Appendix EKHBRD 011 014 016 AB AC Y1 ...
Page 257: ...ESIE09 08A Wiring Diagrams Appendix 247 ...
Page 260: ...Wiring Diagrams ESIE09 08A 250 Appendix ...