1. Determine the weight of refrigerant to be charged additionally.
Piping length is the one way length of gas or liquid piping whichever is the longest.
It is not necessary to charge additionally if the piping length is under 10 m.
If the piping length is over 10 m please determine the additional amount of refrigerant to be charged
using the table below.
Table:
Additional charging of refrigerant <unit: kg>
(a) Additional charge not required
Complete recharging
In case complete recharging is required (after a leak, etc.), refer to the table below to determine the
necessary amount of refrigerant.
Before recharging, make sure to execute vacuum drying of the internal piping of the unit as well. To
do so, use the internal service port of the unit. Do NOT use the service ports located on the stop valve,
since vacuum drying can not be performed properly from these ports.
Outdoor units have 1 port on the piping. It is between the heat exchanger and the 4-way valve.
Table:
Total charging amount <unit: kg>
2. After the vacuum drying is finished, open valve A (5) and charge the additional refrigerant in its
liquid state through the service port on the liquid stop valve taking into account following
instructions:
- Turn on the power of the outdoor unit and indoor units.
- Check that gas and liquid stop valves are closed.
- Stop the compressor and charge the specified weight of refrigerant.
To avoid compressor breakdown. Do not charge the refrigerant more than the specified amount.
Procedure: Charging while the outdoor unit is at a standstill
Refrigerant piping length
3~10 m
10~20 m
20~30 m
30~40 m
40~50 m
(a)
0.54
1.08
1.62
2.16
Refrigerant piping length
3~10 m
10~20 m
20~30 m
30~40 m
40~50 m
4.5
5.0
5.6
6.1
6.7
Summary of Contents for ALTHERMA HT EKBUHAA6 V3
Page 2: ......
Page 7: ...ESIE09 08A Table of Contents v 1 3 Service Tools 283 Index i Drawings Flow Charts iii ...
Page 16: ...Model Names of Indoor Outdoor Units Tanks ESIE09 08A 4 General Information ...
Page 28: ...Refrigerant Circuit ESIE09 08A 16 Refrigerant Circuit EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 40: ...Functional Parts Layout ESIE09 08A 28 Refrigerant Circuit ...
Page 63: ...ESIE09 08A PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 Refrigerant Circuit 51 ...
Page 64: ...PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 ESIE09 08A 52 Refrigerant Circuit ...
Page 125: ...ESIE09 08A Field Setting Test Operation 113 ...
Page 232: ...Troubleshooting by Indication on the Remote Controller ESIE09 08A 222 Troubleshooting ...
Page 237: ...ESIE09 08A Piping Diagrams Appendix 227 EKHBRD 011 014 016 AB AC V1 Y1 ...
Page 250: ...Wiring Diagrams ESIE09 08A 240 Appendix EKHBRD 011 014 016 AB AC V1 ...
Page 251: ...ESIE09 08A Wiring Diagrams Appendix 241 ...
Page 256: ...Wiring Diagrams ESIE09 08A 246 Appendix EKHBRD 011 014 016 AB AC Y1 ...
Page 257: ...ESIE09 08A Wiring Diagrams Appendix 247 ...
Page 260: ...Wiring Diagrams ESIE09 08A 250 Appendix ...