DGS-1100/ME Metro Ethernet Managed Switch CLI Reference Guide
3
HARDWARE INSTALLATION
This chapter provides unpacking and installation information for the D-Link Switch.
Step 1: Unpacking
Open the shipping carton and carefully unpack its contents. Please consult the packing list located in the User
Manual to make sure all items are present and undamaged. If any item is missing or damaged, please contact
your local D-Link reseller for replacement.
Packing contents of DGS-1100/ME
•
One D-Link DGS-1100/ME Series Switch
•
One AC power cord
•
Four rubber feet
•
Screws and two mounting brackets
•
One Multi-lingual Getting Started Guide
•
One CD with User Manual
If any item are found missing or damaged, please contact the local reseller for replacement.
Step 2: Switch Installation
For safe switch installation and operation, it is recommended that you:
•
Visually inspect the power cord to see that it is secured fully to the AC power connector.
•
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
•
Do not place heavy objects on the switch.
Desktop or Shelf Installation
When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on
the bottom, at each corner of the device’s base. Allow enough ventilation space between the device and the
objects around it.
7