CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 10 – POWERPLANT
Date of issue: 2011-11-08
Revision No.: 2
10 - 33
WARNING:
ENGINE IGNITION MUST BE SWITCHED OFF!
(a) Set the throttle control lever with choke (1, Fig, 10-19) into the middle channel.
(b) From one side shift the bolts (2) into the holes on the middle channel side.
(c) Gradually put first bushings (3), throttle control lever with choke (1) and second bushings (4)
on the wheel bolts (2) according to the figure.
(d) Install washers (6), screw and tighten nuts (5).
(e) Connect the throttle (7) and choke (9) cables to the throttle control lever with choke (1), and
to the carburetor levers (12; 13).
(f) Install the cover (11) on the middle channel.
(g) Install the upper engine cowling.
(h) Check for continuous travel of the throttle and choke control lever.
(i) Adjust the throttle and choke control (see 10.4.5, 10.4.6).
10.3.21
Carburetors heating knob removal
Type of maintenance: line
Authorization to perform:
-
Sport pilot or higher
Tools needed:
-
wrench size No.8, No.14
-
screwdriver
-
cutting pliers
(a) Remove the upper engine cowling.
(b) Disconnect the control cable (13, Fig. 10-17) on the changeover lever (14) of the air intake.
(c) Remove the inner nut (1, Fig. 10-20a) and pull out the knob (2) with the flexible housing (3)
from the firewall and instrument panel.
1 Nut
3 Flexible housing
2 Heating control knob
Fig. 10-20a
: Carburetors heating knob