CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 10 – POWERPLANT
Date of issue: 2018-09-27
Revision No.: 22
10 - 23
(m) Run the propeller for approximately 5 minutes at 50 % of the desired rpm. Check the
clamping bolts to see if they have lost torque. If they have, it is because the blades have
firmly seated themselves. Tighten again to the proper torque.
NOTE:
This torque value should be checked after the first 5 hours of operation and
every 25 hours thereafter.
(n) Put the propeller spinner (2, Fig. 10-14) on the propeller and attach it with screws (10) and
washers (11).
10.3.11
Air intake system removal
Type of maintenance: line
Authorization to perform:
-
Sport pilot or higher
Tools needed:
-
wrench size No.8, No.10
-
screwdriver
WARNING:
ENGINE IGNITION MUST BE SWITCHED OFF!
(a) Remove the upper engine cowling.
(b) Disconnect the control cable (13, Fig. 10-17) from the air intake changeover lever (14) and
from the holder.
(c) Remove the hose fasteners (4; 5; 16) and disconnect hoses (2; 3), drain hoses (6; 7), and
air hoses (8; 15).
(d) Unscrew nut (12), remove washer (11), silentblock (9), and disconnect the bracket (10).
(e) Remove the airbox from the engine and store it.