![Comnet CNGE20MS Installation And Operation Manual Download Page 8](http://html1.mh-extra.com/html/comnet/cnge20ms/cnge20ms_installation-and-operation-manual_2644359008.webp)
INS_CNGE24MS-OB(M,S)_REV–
09/12/12 PAGE 8
INSTALLATION AND OPERATION MANUAL
CNGE24MS-OB(M,S)
TECH SUPPORT: 1.888.678.9427
Rack-mount Installation
The device comes with two mounting kits for you to install the device to a rack. Before installation,
keep the following guidelines in mind.
Elevated Operating Ambient: If installed in a closed environment, make sure the operating
ambient temperature is compatible with the maximum ambient temperature (Tma) specified by
the manufacturer.
Reduced Air Flow: Make sure the amount of air flow required for safe operation of the equipment
is not compromised during installation.
Mechanical Loading: Make sure the mounting of the equipment is not in a hazardous condition
due to uneven mechanical loading.
Circuit Overloading: Consideration should be given to the connection of the equipment to the
supply circuit and the effect that overloading of the circuits might have on overcurrent protection
and supply wiring. Appropriate consideration of equipment nameplate ratings should be used
when addressing this concern.
Wall-Mounting Measurement (Unit = mm)
Follow the steps below to install the device to a rack.