![CleaverBrooks CB Ohio Special 100 HP Operation, Service And Parts Manual Download Page 67](http://html1.mh-extra.com/html/cleaverbrooks/cb-ohio-special-100-hp/cb-ohio-special-100-hp_operation-service-and-parts-manual_2622091067.webp)
Chapter 4 — Sequence of Operation
Part No. 750-184
4-7
caused by failure to ignite the pilot, or the main flame, or by loss of flame.
Lockout will also occur if flame or flame simulating condition occurs during
the prepurge period.
The control will prevent start-up or ignition if limit circuit controls or fuel
valve interlocks are open. The control will lock out upon any abnormal
condition affecting air supervisory controls wired in the running interlock
circuit.
!
Warning
The lockout switch must be manually reset following a safety
shutdown. The cause for loss of flame or any unusual condition
should be investigated and corrected before attempting to restart.
Failure to follow these instructions could result in serious personal
injury or death.
1.
No pilot flame
The pilot flame must be ignited and proven within a 10-second period after
the ignition cycle begins. If not proven within this period, the main fuel valve
circuit will not be powered and the fuel valve(s) will not be energized. The
ignition circuit is immediately deenergized and the pilot valve closes, the
reset switch lights and lockout occurs immediately.
The blower motor will continue to operate. The flame failure light and the
alarm bell (optional) are energized 10 seconds later.
The blower motor will be deenergized. The lockout switch must be manually
reset before operation can be resumed (refer to the previous caution).
2.
Pilot but no main flame
When the pilot flame is proven, the main fuel valve circuit is energized.
Depending upon the length of the trial-for-ignition period, the pilot flame will
be extinguished 10 or 15 seconds later. The flame detecting circuit will
respond to deenergize the main fuel valve circuit within 2 to 4 seconds to
stop the flow of fuel. The reset switch lights and lockout occurs immediately.
The blower motor will continue to operate.
The flame failure light and alarm bell (optional) are energized 10 seconds
later.
The blower motor will be deenergized. The lockout switch must be manually
reset before operation can be resumed (refer to the previous caution).
3.
Loss of flame
If a flame outage occurs during normal operation and/or the flame is no
longer sensed by the detector, the flame relay will trip within 2 to 4 seconds
to deenergize the fuel valve circuit and shut off the fuel flow. The reset switch
lights and lockout occurs immediately. The blower motor continues
operation. The flame failure light and alarm bell (optional) are energized 10
seconds later.
The blower motor will be deenergized. The lockout switch must be manually
reset before operation can be resumed. (Refer to the previous caution.)
If the burner will not start, or upon a safety lockout, the trouble shooting
section in the operating manual and the technical bulletin should be referred
to for assistance in pinpointing problems that may not be readily apparent.
Summary of Contents for CB Ohio Special 100 HP
Page 2: ...ii ...
Page 8: ...viii ...
Page 42: ...Chapter 2 Burner Operation and Control 2 22 Part No 750 184 ...
Page 116: ...Chapter 6 Adjustment Procedures 6 28 Part No 750 184 ...
Page 126: ...Chapter 8 Inspection and Maintenance 8 6 Part No 750 184 ...
Page 153: ...Chapter 9 Parts Part No 750 184 9 3 Insulated Front Head Model CB LE ...
Page 154: ...Chapter 9 Parts 9 4 Part No 750 184 Insulated Front Head Interior Model CB LE ...
Page 155: ...Chapter 9 Parts Part No 750 184 9 5 Insulated Inner Door Model CB OS ...
Page 156: ...Chapter 9 Parts 9 6 Part No 750 184 Insulated Rear Head CB LE ...
Page 157: ...Chapter 9 Parts Part No 750 184 9 7 Insulated Rear Head CB LE ...
Page 158: ...Chapter 9 Parts 9 8 Part No 750 184 Insulated Rear Head CB OS ...
Page 159: ...Chapter 9 Parts Part No 750 184 9 9 Dry Oven Model CB LE ...
Page 161: ...Chapter 9 Parts Part No 750 184 9 11 Motor Impeller Model CB LE ...
Page 162: ...Chapter 9 Parts 9 12 Part No 750 184 Front Head Linkage ...
Page 170: ...Chapter 9 Parts 9 20 Part No 750 184 Control Cabinet Hawk ICS ...
Page 171: ...Chapter 9 Parts Part No 750 184 9 21 Control Panel Standard ...
Page 172: ...Chapter 9 Parts 9 22 Part No 750 184 Entrance Box ...
Page 173: ...Chapter 9 Parts Part No 750 184 9 23 Front Head Electrical CB LE ...
Page 174: ...Chapter 9 Parts 9 24 Part No 750 184 Front Head Electrical CB LE ...
Page 175: ...Chapter 9 Parts Part No 750 184 9 25 Front Head Electrical CB OS ...
Page 176: ...Chapter 9 Parts 9 26 Part No 750 184 Front Head Electrical CB OS ...
Page 179: ...Chapter 9 Parts Part No 750 184 9 29 Heavy Oil Piping 60 Steam CB LE ...
Page 180: ...Chapter 9 Parts 9 30 Part No 750 184 Heavy Oil Piping 60 Steam CB LE SEE TABLE NEXT PAGE ...
Page 181: ...Chapter 9 Parts Part No 750 184 9 31 Common Oil Parts Heavy Oil ...
Page 182: ...Chapter 9 Parts 9 32 Part No 750 184 Side Mounted Air Compressor Piping ...
Page 183: ...Chapter 9 Parts Part No 750 184 9 33 Air Compressor Piping CB OS ...
Page 185: ...Chapter 9 Parts Part No 750 184 9 35 Light Oil Piping ...
Page 186: ...Chapter 9 Parts 9 36 Part No 750 184 Light Oil Air Piping Front Head ...
Page 187: ...Chapter 9 Parts Part No 750 184 9 37 Light Oil Air Piping Front Head PAGE 9 31 ...
Page 191: ...Chapter 9 Parts Part No 750 184 9 41 Gas Train 125 150 HP ...
Page 193: ...Chapter 9 Parts Part No 750 184 9 43 Gas Train 200 HP ...
Page 195: ...Chapter 9 Parts Part No 750 184 9 45 Steam Pressure Controls ...
Page 196: ...Chapter 9 Parts 9 46 Part No 750 184 Hot Water Temperature Controls ...
Page 197: ...Chapter 9 Parts Part No 750 184 9 47 Water Column ...
Page 198: ...Chapter 9 Parts 9 48 Part No 750 184 Water Column ...
Page 199: ...Chapter 9 Parts Part No 750 184 9 49 Fireside Gaskets CB LE ...
Page 200: ...Chapter 9 Parts 9 50 Part No 750 184 Fireside Gaskets CB OS ...