Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
64
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
Installation Manual
_________________________________________________________
Installing the Cabinet Ground Connection
Install the cabinet's connection to the earth ground circuit before you install power.
Note:
The height of the main ground bar is adjustable. You can reposition the ground bar on the rack by unscrewing its (4)
mounting screws and moving it up or down as required.
To install the cabinet ground connection
Open the splice compartment door.
Route the earth ground wire to the main ground bar and cut the wire to length.
Using a crimp tool, attach a two-hole compression lug (#2 AWG, 3/4-inch hole spacing) to the earth
ground wire.
At the middle of the ground bar, locate a ground position with 3/4-inch stud spacing. Remove the nuts
from the identified terminal studs.
Attach the earth ground wire's two-hole lug onto the 3/4-inch ground terminal studs.
Re-connect the nuts to the ground terminal studs and tighten to 26 inch-lbs. of torque.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6: