Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
22
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
Installation Manual
_________________________________________________________
Chapter 3: Preparing the Installation Site
This chapter describes how to prepare the FAC 3200 installation site for cabinet placement, including establishing the
mounting structure. You can install the cabinet onto a concrete foundation pad or a vertical mounting surface (pole or
wall/H-frame).
For pad-mount applications, you can construct a concrete pad using the Clearfield cast-in-place template or use a pre-
cast concrete pad. To mount the cabinet on a vertical surface, use the Clearfield pole-mount or wall-mount kits to provide
the cabinet mounting fixture.
For all mounting configurations, Clearfield requires installation of an earth ground circuit at the installation site to provide
lightning protection.
Topics Covered
This chapter covers the following topics:
• Installing a ground circuit at the installation site.
• Constructing a concrete pad.
• Installing a pre-cast concrete pad.
• Installing a pole mounting kit.
• Installing a wall/H-frame mounting kit